Aluminium tooling
reduces upfront investment by 30–50% vs production hardened steel molds.
Flexible mid-run production from 500 to 100,000 units — bridging prototype validation and full-scale manufacturing.
Mid volume production is suitable for product launches, ongoing small-batch supply, design-iteration programs, and markets where annual demand does not justify full hardened steel tooling. NICE Rapid supports flexible mid-run production from 500 to 100,000 units with aluminium tooling, CNC machining, compression molding, and LSR injection molding.
reduces upfront investment by 30–50% vs production hardened steel molds.
faster response to design changes.
batch inspection records on every production run.
aluminium tooling can be upgraded to steel if volumes grow beyond mold life.
Aluminium or P20 soft steel tooling for 1,000–50,000 shots. Part quality and cycle times comparable to production steel tooling. Suitable for all standard thermoplastic materials.
No tooling required. Suitable for metal and plastic parts at medium volumes where geometry or material does not suit molding. Each part produced directly from CAD.
Multi-cavity aluminium compression molds for medium-volume rubber parts. Suitable for seals, gaskets, and silicone parts at 1,000–10,000 pieces.
Aluminium LSR tooling for medium-volume silicone parts. Same process quality as steel tooling at lower initial cost.
Confirm production quantity and program duration.
Aluminium or soft steel tooling recommended based on volume, geometry, and design stability.
Tooling produced, trialed, and approved.
Initial production run with full dimensional inspection report.
Repeat batches scheduled as required. Tooling maintained by NICE Rapid.
Option to upgrade to steel tooling if volume increases beyond aluminium mold life.
Material specifications depend on process. Full material tables are available on the CNC Machining, Plastic Injection Molding, Compression Molding and Die Casting pages.
Volume range: 500–100,000 parts per production run
Aluminium tooling lead time: 1–2 weeks
P20 soft steel tooling lead time: 3–4 weeks
Production batch lead time: 1–2 weeks after tooling approval
Minimum order: 500 pieces per production run
Consumer Products
Medical
Automotive
Industrial Equipment
Electronics
Tell us your volume and timeline. We recommend the right tooling approach within 24 hours.