Rapid Tooling

Rapid tooling produces molds and dies using shorter lead times than conventional production tooling. Aluminum or steel molds are CNC machined directly from CAD data, enabling low-to-mid volume production with realistic part properties.

Rapid tooling bridges the gap between prototype parts and full production investment. Aluminum molds suit early production and market testing. Steel molds support longer-run production programs.

What Sets Us Apart

Engineering-Led Manufacturing

Aluminum mold tooling from 1-2 weeks

faster bridge production without long tooling queues.

Long-run tooling

steel molds rated to 1,000,000 shots for long-term production programs.

Precision tooling

CNC machined molds with cavity tolerances to ±0.05mm.

Process compatibility

injection molding, blow molding, die casting, and compression molding all supported.

Molding Services

Plastic Injection Molding

Thermoplastic parts produced in CNC-machined aluminum or steel molds. Aluminum tooling ready in 1–2 weeks for bridge production; P20 and H13 steel molds for long-run volumes to 1,000,000 shots. Suitable for housings, brackets, connectors, and structural plastic components.

Compression Molding

Silicone rubber and thermoset materials pressed in heated steel molds under hydraulic pressure. Lower tooling cost than injection molding with tooling lead times from 2–3 weeks. Suitable for seals, gaskets, keypads, and flat-to-moderate geometries.

LSR Molding

Liquid silicone rubber injected into self-sealing molds using automated 2-component metering. Flash-free production with food-grade and medical-grade certification available. Suitable for precision silicone parts, wearables, and medical device components.

Our Process

STEP 1

Design Review

Submit CAD files in STEP, IGES, STL, DWG, or DXF format.

STEP 2

Mold Design

Our engineering team recommends the best process for your part, timeline, and material requirement.

STEP 3

CNC Machining

Lead time, cost, and process confirmed within 24 hours.

STEP 4

Mold Trial T1

Parts produced using the confirmed process.

STEP 5

Mold Modifications

Dimensions and surface quality checked before dispatch.

STEP 6

Production Approval

Parts packed and shipped to your location.

Materials

MaterialKey PropertiesSuitable Applications
Aluminium 7075Fast machining, good thermal conductivityBridge tooling, low-volume injection molds
P20 Tool SteelGeneral purpose, pre-hardened, good polishMid-volume production molds
H13 Tool SteelHigh hardness, abrasion resistantHigh-volume molds, glass-filled or abrasive materials
S136 Stainless SteelCorrosion resistant, high polishClear part molds, medical-grade applications
Beryllium CopperExtremely high thermal conductivityHot spot inserts, rapid-cooling core sections

The Output

Aluminum mold lead time: 1–2 weeks

P20/H13 steel mold lead time: 3–6 weeks

Aluminum mold life: 1,000–50,000 shots

Steel mold life: 100,000–1,000,000+ shots

Mold cavity tolerance: ±0.05mm

Cavities: 1–16 cavities per mold (depends on part size and volume requirement)

Industries We Serve

Automotive

Medical and Life Sciences

Consumer Electronics

Industrial Equipment

Packaging

From Design to Mould in Days.

Share your part drawings and production requirements. Our tooling engineers will review and respond with a quotation and lead time.